Reliability centred maintenance
NRM3: Order of cost estimating and cost planning for building maintenance works, defines ‘Reliability centred maintenance’ (RCM) as: ‘…a process used to determine what must be done to ensure that any physical asset continues to do what its users want it to do in its present operating context.’
This requires a mix of preventative maintenance, proactive maintenance and reactive maintenance designed to optimise reliability whilst minimising costs. It is based on the principle that using any one of these three types of maintenance alone would be somewhat arbitrary and unlikely to minimise failures.
There is a detailed description of different types of RCM at https://www.wbdg.org/resources/reliability-centered-maintenance-rcm
Business-Focused Maintenance (BG 53/2016), written by Jo Harris and published by BSRIA in May 2016, defines reliability-centred maintenance (RCM) as: ‘…a methodology that has been developed to ensure assets continue to fulfil their design function. It is introduced to achieve improvements to availability of assets and establish the level of maintenance required. Successful implementation of RCM is designed to lead to an increase in cost-effectiveness and asset uptime, and a greater understanding of the level of risk that the organisation is managing.’
[edit] Related articles on Designing Buildings
- Building owner's manual.
- Business focused maintenance.
- Construction inventory management.
- Cost plan.
- Enterprise asset management.
- Facilities management.
- In-house or outsource maintenance.
- Predictive maintenance.
- Preventative maintenance.
- Proactive maintenance.
- Resource management.
- Unplanned maintenance.
- Scheduled maintenance.
- Soft landings.
[edit] External references
Featured articles and news
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.